Brazil is South America’s fastest-growing padel market and one of the hardest to price from a supplier quote. Between the FOB value of a kit and the court your club opens sit ocean freight, AFRMM, II, IPI, PIS/COFINS-Importação and ICMS — each charged on a base that already contains the previous ones. Here is how that stack is built, what a typical kit lands at, which NCM lines a court is split into, and where first-time importers lose money.
The six charges on a Brazilian import, a worked example from FOB to landed cost, how a mixed court kit is classified, container and port planning, the clearance document set, national versus imported cost, the door-to-door timeline and the five avoidable mistakes.
The court is 20 × 10 m everywhere. What differs is everything charged on top of it.
The FIP’s 2026 survey records 40 million players and 91,234 courts worldwide, with Brazil showing the strongest growth of any South American country across at least 16 states. The Confederação Brasileira de Padel governs the sport and is recognised by the FIP, so dimensions, glass height and surface follow the same rulebook. The commercial side is far less standard: national suppliers advertise roughly R$ 110,000–165,000 per court delivered, and a complete build at R$ 120,000–200,000, while imported kits are quoted FOB at a Chinese port with a tax cascade that importers describe as adding 50%–130% of FOB. Comparing those two numbers directly is the single most common costing error in Brazilian padel projects.
Comparing those two numbers directly is the single most common costing error in Brazilian padel projects.
Six charges, not one — and each is calculated on a base that includes the previous ones, so they multiply.
ICMS is charged por dentro: an 18% headline behaves like 21.9% of the pre-ICMS total, because the rate is extracted from a base that already includes the tax. And because IPI follows II and ICMS follows all of them, a buyer who simply adds the percentages together understates the bill every time. Rates above are planning figures, not a legal opinion — II and IPI depend on the NCM declared, ICMS on your state and on whether the court is for resale or own use.
One court, one 40’ high-cube container, II at 20%, IPI at 5%, ICMS at 18%.
None of this includes unloading, inland trucking, foundation, lighting or the club’s own labour: a landed figure at port is a midpoint, not an answer.
Send the court configuration, the destination port and your state. We will quote FOB per line, with a packing list carrying NCM suggestions and a container loading plan, so your despachante can model the tax stack on real numbers instead of a range.
Prefer an instant answer? Ask the AI assistant at the bottom-right.
A court is not one product: it is steel, glass, turf, sand, net and lighting, and each carries its own NCM line.
Declaring the whole kit under 9506.99.00 as a complete sports installation is simpler — one line, one rate — but that rate may exceed the weighted average of the parts, and a consignment visibly containing light-industrial steel and glass invites questions. Splitting the invoice into components costs more paperwork and usually lowers the weighted rate. If several courts are involved, request a Consulta de Classificação Fiscal from the Receita Federal: it gives a written answer that protects the importer, not the supplier, from a later reclassification and fine. Ask the factory for a per-line proforma with net and gross weight, material and packing description.
One standard court is about 13 tonnes of material. Volume, not weight, decides the loading plan.
A 20 × 10 m court ships as roughly 3.5–4.5 t of hot-dip galvanised steel, 190–210 m² of 12 mm tempered glass (40–46 panels), ~230 m² of turf and 3–4 t of silica sand — about 13 tonnes before foundations and lighting. A 40’ high-cube carries 26 tonnes by weight, so the limit is volume, and the glass crates decide whether one or two courts travel together. Never accept “two courts per container” without a loading plan showing crate dimensions.
Kits usually leave from Qingdao, Ningbo or Shanghai and discharge at Santos (SP) for São Paulo and the interior, Itapoá (SC), Paranaguá (PR), Suape (PE) for the Northeast or Rio Grande (RS) for the South. Transit is typically 35–45 days. Pack glass upright in ISPM-15 heat-treated crates, bundle steel with edge protection, and keep the packing list matching the invoice line for line — untreated wood or a crate count that does not match the documents is a cost and a delay charged to the importer.
The importer of record needs a Siscomex credential before the cargo arrives, not after.
A despachante aduaneiro is not optional in practice, and their fee is small against one misclassified line. Give them the proforma and packing list before the deposit, not after the container sails: a classification problem found at the port cannot be fixed by the supplier on the other side of the ocean.
Most “import is cheaper” conclusions compare a kit against a finished court.
Brazilian builders publish a useful rule: everything around the court — base, earthworks, lighting, roof, drainage, fencing, changing rooms, project and taxes — costs roughly the same order of magnitude as the court itself. Importing wins on multi-court and panoramic projects, on specifications the local catalogue lacks, and on parts for refurbishment; national supply wins on a single basic outdoor court needed within ten weeks.
Ninety to one hundred and twenty days door to door, and the first two weeks decide the rest.
Book the foundation against the vessel ETA, not the order date. The most common schedule failure in imported projects is a foundation that is not ready when the container arrives, turning free days at the terminal into demurrage paid by the importer.
Five recurring errors, each visible in the invoice after the fact.
It depends on the project. A national kit is quoted at roughly R$ 110,000–165,000 delivered per court with no freight or clearance work for you; an imported kit is cheaper at FOB but lands at about 1.9–2.3 times that value. Importing wins on multi-court and panoramic projects and on parts for refurbishment. For a single basic outdoor court needed quickly, national supply usually wins on total cost and service.
Between roughly 90% and 130% over the FOB value once II, IPI, PIS/COFINS-Importação, ICMS and AFRMM are paid. The exact figure depends on the NCM rates you declare and your state’s ICMS. Because each charge sits on a base that includes the previous ones, adding the headline percentages always underestimates the result — model it line by line with your despachante.
It can, usually under 9506.99.00 as a complete sports installation, but it is not always cheapest or safest. Steel structures, tempered glass and synthetic turf each have their own heading, and a consignment declared as sports equipment that visibly contains light-industrial steel and glass may be questioned. Compare the weighted rate of a split invoice against the single-line rate first.
Budget USD 1,500–3,500 per 40’ high-cube from South China to Santos, varying with season, carrier and fuel. Freight also enters the customs value, so a cheaper rate lowers the base for every tax in the stack — and AFRMM is charged at 8% of it. Quote freight live before committing to a delivered price.
12 mm tempered safety glass is the standard outdoors, and the reason is load: wind pressure, thermal cycling between a hot day and a cool night, and ball impact all act on the same panel. 10 mm is defensible for indoor courts with controlled conditions. Specify an EN 12150 or equivalent test report, neoprene gaskets and PVC bushings so glass never touches steel.
A per-line proforma and packing list with NCM suggestions, net and gross weights, crate dimensions and ISPM-15 treatment; a hot-dip galvanising certificate for the steel; EN 12150 test reports for the glass; and a loading plan with photographs of the packed container. Insurers and banks ask for the same set, and a supplier who cannot produce it before shipment will not produce it after a claim.
Send the site plan, the state your club is in and the number of courts. We will return a per-line FOB quote, NCM suggestions for your despachante, a container loading plan and the realistic window from deposit to first booking.
Prefer an instant answer? Ask the AI assistant at the bottom-right.