Key takeaway: education buyers do not buy a padel court the way a commercial club does โ they buy a tender-ready package. A campus court is still a standard FIP court (20 m ร 10 m, 12 mm tempered glass, 6 m minimum clear height), but three things decide whether the project survives procurement and planning: a site option that reuses existing ground (a single 36 ร 18 m tennis court takes two padel courts side by side, or up to three on the same footprint), a specification written around safety, accessibility and noise rather than around brand names, and a documentation package โ foundation drawings, anchor layouts, load calculations, certificates and a 3D assembly manual โ that your estates team and local structural engineer can sign off. Budget factory-direct court kits from $38,000โ$82,000 per court, plus $10,000โ$25,000 of groundworks and $15,000โ$35,000 of installation, and place the order at least 4โ6 months before the holiday window you want to build in.

Padel grew up in private clubs, but the next wave of courts is being built on campuses. Padel is a doubles game by default, it is easy to teach, it is social rather than intimidating, and it needs roughly a third of the space of a tennis court โ which is exactly what a school with an ageing tennis block, a university with an under-used sports hall, or a municipality with a redundant hard court already has.
For a B2B buyer, the consequence is a different kind of order. A commercial club buys one to six courts in a single decision. An education estate buys one or two courts as a pilot, then replicates across campuses over the following budget cycles. The pilot is a specification exercise: if the first court is well specified and the paperwork is clean, the second order is a repeat purchase with no new technical work. If the first court is bought on price alone โ thin glass, untreated steel, no drawings, no spare parts โ the estate will not buy again, and the failure will be attributed to the sport rather than to the purchase.
This guide is written for the people who actually run these projects: bursars and estates managers, directors of sport, facilities managers, architects and the contractors who bid for education work. It covers site options, tender specification, budget, funding, certification, installation windows and the operating model that makes a campus court sustainable after the novelty wears off.
The court itself is the same product a club buys. Everything around it is different, and those differences are where education projects go wrong.
| Dimension | Commercial club | School / university |
|---|---|---|
| Decision route | Owner or investor, fast | Committee, capex cycle, often a formal tender |
| Primary use | Paying customers, peak evenings | Curriculum and student sport by day, community hire outside hours |
| Safety expectations | Player comfort and insurance | Safeguarding, supervision lines of sight, no pinch points, documented compliance |
| Accessibility | Desirable | Often a legal duty โ minimum 1.2 m clear between net post and enclosure for sports wheelchairs, hinged gates, level circulation |
| Neighbours | Site chosen for access | Campus edge, residential streets, exam halls โ noise and light both matter |
| Documentation | Wanted if available | Required for the file: drawings, certificates, load calculations, O&M information |
| Installation window | Any quiet period | Term breaks only; the site must be safe and separated while students are present |
| Success measure | Revenue per hour | Participation hours, inclusion, community use โ plus any hire income |
Two of those rows deserve early attention. Accessibility is not an optional upgrade: the clearance between the net post and the enclosure is what lets a sports wheelchair enter the court, and it has to be designed at the frame stage. Neighbours are the most common reason an education court is delayed, because campus courts often sit closer to housing or teaching space than a commercial site would โ see our noise and soundproofing guide for the design measures that resolve it.
Cost is driven far more by the ground than by the court. Reusing an existing hard surface can remove most of the civil works budget.
| Option | What it needs | Cost profile |
|---|---|---|
| 1. Convert an existing tennis court | A sound, level base. One 36 ร 18 m tennis court takes two padel courts side by side with the required gap between them; on some footprints three will fit. | Lowest: the base already exists. Additional drainage and re-levelling may be required โ see the tennis-to-padel conversion guide. |
| 2. Spare hard standing or field margin | Roughly 22 ร 12 m of clear, level ground per court, plus drainage and a new reinforced base. | Medium: full foundation and drainage scope. |
| 3. Indoor sports hall or under-used gym | 6 m minimum clear height (8 m preferred), roughly 11 ร 21 m of usable floor per court, ventilation sized for sweat load. | Medium-high: no foundation cost, but lighting, ventilation, floor protection and out-of-hours access all add scope. |
| 4. Roofed outdoor court | An outdoor court plus a canopy over the playing area. | Highest: roughly $30,000โ$55,000 of roof per court, but it converts a fair-weather amenity into year-round provision. |
The practical sequence is: survey the existing surfaces first. A well-built tennis court or Multi-Use Games Area with adequate drainage is the cheapest path to a campus padel court, and it keeps a familiar facility in service. Only when no suitable base exists should you budget a new build. Our dimensions guide lists the site footprint and run-off figures you need for the survey, and our indoor requirements guide covers the ceiling-height, floor-loading and ventilation checks for option three.

A tender that specifies a brand cannot be compared. A tender that specifies performance and materials can. The table below is the minimum an education buyer should require; it is written so that any competent manufacturer can meet it and any shortcut bidder can be excluded on documented grounds.
| Element | Requirement to write into the tender | Why it matters on campus |
|---|---|---|
| Playing area | 20 m ร 10 m internal, FIP standard, line markings per FIP | Non-negotiable for coaching, competition and future tournament use |
| Back walls | 4 m total height โ 3 m glass plus 1 m mesh | Consistent ball rebound; the mesh section is the cheapest part to replace after impact damage |
| Side walls | 3 m glass with mesh above, complete with the access openings | Rebound consistency and clear supervision of the court from outside |
| Glass | 12 mm tempered safety glass, certified to EN 12150, mounted on gaskets โ glass never in contact with bare steel | Fragmentation pattern, edge safety and player protection; the certificate belongs in the project file |
| Steelwork | Structural steel (e.g. Q235B) hot-dip galvanised, with powder coating; certificate for corrosion protection | Outdoor campus courts are exposed 24/7 and often unmonitored in holidays |
| Clear height | 6 m minimum over the whole court, 8 m if competition or a canopy is planned | The lob is a core part of the game; low ceilings make the court feel cramped |
| Accessibility | Minimum 1.2 m clear between net post and enclosure on both sides; hinged gates at all access points | Sports wheelchair access and inclusive participation |
| Lighting | 200 lux for recreational and curriculum use, 300 lux for club and league play, with anti-glare control | Winter after-school sessions and evening community hire both depend on it |
| Surfacing | Padel-specific artificial turf with silica sand infill to the manufacturer's specification | Consistent bounce and grip; slip claims are a real risk on school sites |
| Documentation | Foundation drawing, anchor-bolt layout, structure weights, structural load calculations, packing list, 3D assembly manual, certificates | Your engineer must be able to sign off and your installer must be able to build it |
| Warranty & spares | Written warranty on the steel structure and roofing membrane, plus availability of glass, gaskets, fittings and turf for at least 10 years | Institutions keep assets for decades; unavailability of parts is the risk that closes a court |
Ask every bidder for the same four documents before evaluation: the glass certificate, the corrosion-protection certificate, the load calculation for the enclosure, and a reference list with contacts. Our guide to choosing a padel court manufacturer explains how to verify each of them, including how to tell a factory from a trading company by asking for the production video walk-through rather than a brochure.
Education budgets are annual and visible, so the first question is usually the installed total โ not the ex-works price. Here is the honest structure of a single outdoor campus court, based on factory-direct supply from China with local groundworks.
| Budget line | Range per court | Notes |
|---|---|---|
| Court kit, factory-direct (FOB China) | $38,000 โ $82,000 | Steel frame, 12 mm tempered glass, mesh, turf, net, fittings, doors, packing. Classic models sit at the lower end, panoramic and super-panoramic above. |
| Ocean freight and delivery | $5,000 โ $15,000 | One 40 ft container per court; destination port and inland trucking drive the range |
| Foundation, drainage and groundworks | $10,000 โ $25,000 | Substantially lower if an existing sound hard court base is reused; higher on soft or sloping ground |
| Installation and assembly | $15,000 โ $35,000 | 5โ7 working days for a trained 3โ4 person crew once the base has cured; a specialist crew may be required for glass lifting |
| Lighting | $3,000 โ $8,000 | Optional but effectively essential for after-school and evening hire |
| Contingency | 10 % of project | Surveys, crane hire, utility diversions, landscape reinstatement |
Realistically, a first outdoor campus court lands between $75,000 and $160,000 fully installed in high-labour-cost countries, and materially below that where groundworks are cheap or an existing tennis base is reused. Continuing costs are modest: our maintenance benchmarks put routine care at $3,500โ$6,500 per court per year for a commercially used court, and lower for a school court used mainly in term time โ plus a turf replacement reserve for the 8โ10 year horizon. Full component-level pricing is in our padel court cost guide.
Very few campus courts are funded from a single line. The projects that get built usually stack three or four sources.
One caution for budget holders: external funding usually requires the specification and the accessible design to be evidenced in the application. Buyers who leave the paperwork until after procurement often lose grant eligibility on a technicality.
Education procurement is designed to make decisions defensible, and a padel court is an unusual purchase for most purchasing teams. Three things make it go smoothly.
Put the deliverables in the contract, not in an annex. Packing list, foundation drawing signed off before production, anchor layout, structure weights, load calculations, certificates, assembly manual, and a named contact for installation support. If it is not a contractual deliverable, it will not arrive.
Buy documentation as part of the price. A factory-direct supplier provides engineering documentation as standard; a reseller often has to request it from the factory, which is where delays start. Our own court packages ship with foundation drawings, a 3D assembly manual and full certification for exactly this reason, and the buyer's verification checklist shows what to demand if you are comparing suppliers.
Decide early who installs. Two models work. Either the factory's installation team or a factory-trained specialist assembles the court, or your appointed contractor does the civil works and assembles the court with remote video support from the factory. The second is usually cheaper for a single court and keeps the work with a local firm your estates team already trusts โ but it only works if the drawings and the labelled packing list arrive before the container does. Freight, customs and duties are covered in our shipping and import guide.
The single most common cause of an education court slipping a year is a purchase order placed after Easter for a summer installation. Work backwards from the return date.
| Stage | Lead time |
|---|---|
| Design confirmations, drawings approved, deposit placed | 1โ2 weeks |
| Factory production | 25โ35 working days |
| Ocean freight to destination port | 20โ40 days depending on route |
| Local groundworks and base curing | 2โ4 weeks (runs in parallel with production and freight) |
| On-site assembly and commissioning | 5โ7 working days |
In practice that means 4โ6 months from order to first serve. Order in February for a July build; order in September for a spring installation.
While students are on site, the working area must be separated and supervised. Specify in the contract that the installation crew works inside a fenced compound, that site inductions and safeguarding checks are completed before anyone arrives, and that deliveries of steel and glass are scheduled outside peak movement times. Glass lifting in particular needs a planned route and a crane or telehandler โ not an improvised one on the day the container lands.
A campus court is usually paid for twice: once from capital, and once from the day-to-day cost of running and staffing it. The economics improve sharply when the court runs two shifts โ institution and community.
Two design decisions make this model work: lighting good enough for evening play, and a booking and access routine that does not need a member of staff present for every session.
Institutional courts fail for a different reason than club courts. Clubs over-use theirs; schools under-maintain theirs. The routine is short and can be handled by existing site staff with a basic kit.
| Frequency | Task |
|---|---|
| Weekly | Brush the turf (twice weekly in heavy use), clear leaves and litter from the surface and drainage channels |
| Monthly | Clean the glass both sides, test all lights, walk the enclosure checking bolts and gaskets |
| Quarterly | Check and top up sand infill, inspect gate hardware and access openings |
| Annually | Structural inspection, re-torque fittings, touch up any coating damage with zinc-rich paint, electrical safety check |
| Year 8โ10 | Plan turf replacement; glass and steel will still be serviceable if the coating has been maintained |
Keep a small spares stock from the original order โ two glass panels, a set of gaskets, door hardware and an extra can of touch-up paint. Reordering single items later costs multiples of the original price because they must be shipped separately. The full routine is in our padel court maintenance guide; the consumables cost per court per year is modest compared with the cost of a court that is closed.
Budget $38,000โ$82,000 for a factory-direct court kit, $5,000โ$15,000 for ocean freight, $10,000โ$25,000 for foundation and groundworks, and $15,000โ$35,000 for installation. A single outdoor campus court typically totals $75,000โ$160,000 fully installed, and considerably less where a sound existing hard court base can be reused.
A standard 36 ร 18 m tennis court takes two padel courts side by side with the required gap between them, and on some footprints three will fit. Each padel court needs only 20 ร 10 m of playing area plus run-off, so a tennis facility is usually the cheapest possible site for a campus padel project.
Usually yes for outdoor courts: the 3โ4 m enclosure walls and 6 m lighting columns generally require consent, and noise or lighting assessments may be required where homes or teaching space are close. Requirements vary by country and municipality, and the process typically takes 4โ12 weeks โ start it at least three months before the planned build date. See our planning permission guide.
Yes, if three conditions are met: at least 6 m clear height below any beams or light fittings (8 m preferred), roughly 11 ร 21 m of usable floor per court, and ventilation or dehumidification sized for the player load. Indoor courts avoid foundation costs and give year-round use, but need lighting, floor protection and out-of-hours access arrangements.
Yes. Padel is played in doubles on a smaller, walled court, so rallies last longer and beginners succeed quickly, which suits mixed-ability classes and younger players. Specify full-height mesh sections, 12 mm tempered glass, gaskets rather than bare-metal joints, and the 1.2 m net-post clearance so the court also works for inclusive and wheelchair play.
On-site assembly takes 5โ7 working days for a trained 3โ4 person crew once the concrete base has cured. Add 25โ35 working days of production and 20โ40 days of ocean freight, so plan on 4โ6 months from purchase order to first serve, with groundworks running in parallel with production and shipping.
PeakPadel supplies complete padel court packages for education projects: FIP-standard 20 ร 10 m courts, 12 mm tempered glass certified to EN 12150, hot-dip galvanised steelwork, 200โ300 lux LED lighting, and the documentation your estates team and structural engineer need โ foundation drawings, anchor layouts, load calculations, certificates and a 3D assembly manual. Tell us the site you have (existing tennis courts, spare hard standing or a sports hall), the number of courts and your installation window, and we will return an itemised quotation with the full technical specification.