PeakPadel supplies the load-bearing steel frame of a padel court: Q235B profiles cut and drilled from an approved shop drawing — 100 × 100 × 3 mm corner posts, 100 × 50 × 3 mm crossbeams, 50 × 30 mm fence frames — hot-dip galvanised to a zinc layer of 70 µm or more and finished with two coats of polyester powder for a 150–300 µm total coating. Base plates, gussets and glazing connections are drilled to your foundation drawing, and every bolt, nut and washer is SUS304 stainless steel, so the frame goes together on site with bolts and no field welding. One standard 20 × 10 m court takes 3.5–4.5 tonnes of galvanised steel. We run our own padel court factories in Hengshui, Hebei: 8 production lines, a 12,000 m² workshop, 1,500 complete court sets a year, and courts playing in more than 30 countries.
This page covers what parts make up a padel court frame, which steel grade and profile sizes to specify, how the structure is protected against corrosion, which fittings and hardware hold it together, what loads it must carry, the tolerances that decide whether the glass and doors fit, how the frame changes between classic, panoramic and super panoramic courts, how the structure is packed, shipped and assembled, which documents and warranty come with it, and what we need from you to quote a structure on its own.
Terms used on this page: Q235B — the Chinese structural steel grade (GB/T 700-2006) used for padel court frames. Corner post — one of the four main columns that carry the glass and mesh at the court corners. Upper ring — the perimeter beam that ties the tops of the posts together. Base plate — the drilled steel plate welded to the foot of each post that bolts down to the foundation. Gusset — the triangular stiffener plate that spreads load at the post-to-beam connection. Ring beam — the reinforced concrete perimeter that the frame is anchored to. Hot-dip galvanising — dipping steel in molten zinc (~450 °C) so the zinc bonds to the surface; the layer that stops rust. SUS304 — the 18/8 stainless grade used for bolts, nuts and washers. Bolt-together assembly — a frame that is cut and drilled at the factory so it is bolted, not welded, on site.
The steel frame is the only part of the court that carries everything else. Every other component — glass, mesh, net, lighting, branding panels — is fixed to it, and every load, including wind, goes through it into the foundation.
A padel court is often described as a flat-pack structure, which makes it sound simple. In practice the frame is a bolted steel assembly of roughly a dozen distinct part types, and it is the line item with the largest weight and the largest freight consequence in the whole kit. If you are buying a court, an OEM container of frames, or a set of spare parts for an existing facility, the table below is the parts list to compare against any quotation.
Two numbers frame this list. First, the steel is the heaviest line in the kit: roughly 3.5–4.5 tonnes of Q235B steel per standard court, which is what your freight forwarder, your crane and your customs declaration are actually dealing with. Second, the steel is not the whole package: add glass, turf, sand and mesh and one court lands around 13 tonnes of delivered material before the foundation and lighting, which is the figure a structural engineer needs when the court goes on a roof deck or a suspended slab.

Two frames can look identical in a photograph and behave completely differently in wind. The difference is written in three numbers: the steel grade, the section size and the wall thickness.
Our frames are made from Q235B structural steel to the Chinese national standard GB/T 700-2006, a low-carbon steel with a tensile strength of 370–500 MPa that welds cleanly and is produced in high volume for construction and machinery. It is the grade we put a mill certificate against, line by line, in your order documents. What usually causes trouble is not the grade on the drawing, but the wall thickness that arrives: a 2 mm or 2.5 mm profile will fit the same glass and the same bolts, and it will flex visibly in wind.
If you specify a heavier profile than you need, you pay for it twice — once in steel and once in freight, because the structure is the densest part of the container. If you specify a lighter one, you pay later in flex, glass alignment and repainting. The practical answer is to fix the profile list against your wind and snow case, and then insist that the delivered bundles are cut from exactly that list. We publish the profile per model so the comparison can be made line by line, and stock profiles are held for volume orders.
Steel rusts. The only real question is how many years of coating you bought, and whether the coating system was specified in writing or assumed from a photograph of a shiny frame.
An outdoor padel court is a permanently wet environment for part of the year, and on a coastal site it is also a salt environment. Both attack the same three places: welds, cut edges and bolt holes, where the protective layer is thinnest. Our standard system is two layers. First, the steel is hot-dip galvanised: the components are immersed in molten zinc at around 450 °C, and the zinc metallurgically bonds to the steel surface to form a zinc-iron alloy layer that is sacrificial — it corrodes before the steel does. Second, after galvanising, the components receive an electrostatically applied polyester powder coat, baked to cure, in two coats. The result is a total coating of 150–300 µm, against an industry average of 60–100 µm.
Three details decide whether the galvanising you paid for is the galvanising you receive. Ask for the zinc thickness measurement, not a certificate of appearance — a galvanising report in grams per square metre or microns tells you the layer is actually there. Confirm that galvanising happens after welding and drilling, not before, because every hole and every weld drawn after coating leaves bare steel. And keep a tin of touch-up paint on site for the scratches that installation inevitably makes, since a scratch in the powder coat cannot repair itself and the zinc underneath only protects until it is consumed.
The fittings are the smallest and cheapest line in the order, and the one that ends the court's warranty conversation if they are downgraded.
A padel court frame is a bolted structure: hundreds of bolts, nuts and washers hold the posts, beams, gussets, base plates, mesh frames and hinges together, and they are exposed to weather for the life of the court. We use SUS304 stainless steel for the full set. SUS304 is 18% chromium and 8% nickel, effectively non-magnetic in the annealed condition, and it holds up in atmospheric exposure, fresh water and most chemical exposure without the rust spotting that appears on lower grades.
The fitting package we quote with the frame covers:
One substitution costs more than any other: zinc-plated mild-steel fasteners in place of stainless. They look identical in a photograph and in a box of mixed parts, they are the first thing to corrode on an outdoor court, and once a fixing fails the panel above it loosens with it. Two minutes with a magnet at the factory is enough — if the fastener is strongly magnetic, it is not SUS304.

Send your court model, the number of courts and your destination port — we reply within 12 hours with the steel BOM line by line, the profile list, the coating spec and a factory-direct price.
Prefer an instant answer? Ask the AI assistant at the bottom-right.
A padel court is a light steel and glass structure with a large surface and little self-weight, which is the opposite of a concrete building. Wind is the load that decides whether your posts, connections and anchors are adequate.
Loads reach the ground through a chain: the glass and mesh take the pressure, the posts take the bending, the base plates take the moment, and the anchor bolts and ring beam take the uplift and the shear. Every link in that chain has to be sized for your site, and the failure mode in real life is rarely a broken post — it is a connection that works loose or a base plate that lifts.
We design our standard frame for a characteristic wind speed of around 120 km/h sustained and then apply the site-specific gust factor, following the wind provisions of ASCE 7 or EN 1991-1-4 together with the steel design rules of EN 1993-1-1. The number that matters to a buyer is not “how much wind can the court take” in the abstract but “what wind speed, exposure and terrain does this frame’s calculation assume, and is that above my site’s requirement”. That calculation, issued as a document, is part of the engineering file for the project. If you are building on a coast, in a typhoon region or above a certain height, say so at enquiry stage: the answer changes the base plates, the anchor detail, the glass restraint and sometimes the profile itself. For a US site the same load documents are reviewed against IBC and ASCE 7 rather than EN, and what a US plan reviewer asks for alongside them is set out in our US padel court building-code guide.
The frame is a bolt-together kit; the foundation is cast on site. The gap between those two facts is where most installation problems are born.
Glass panels are 12 mm tempered sheets that cannot be adjusted with a hammer, and doors have a fixed clearance in their frames. That means a steel frame will only line up if the concrete beneath it is level and the anchor bolts are where the drawing says they are. Anchor bolts must be set in concrete while it is wet; they cannot be drilled and epoxied after curing without compromising accuracy, so the positions are held with a plywood or steel template during the pour and verified before the concrete sets.
The practical consequence for a buyer is that the frame drawings and the foundation drawings have to be issued as one package, by the same supplier, with the same bolt coordinates on both. We issue the foundation drawing with the anchor-bolt layout for every order, and we will check your site engineer's version against ours before the pour. It is a ten-minute comparison that prevents the most expensive kind of rework, because once concrete has cured around a mis-placed bolt, the options are cutting the bolt out or re-drilling the base plate.
The playing box is always 20 × 10 m. What changes between models is how much steel stands between the player and the view — and that is a frame decision, not a glazing decision.
The frame also changes for indoor and roofed courts. An indoor court stands on the hall slab rather than a ring beam, so the base plate detail and the anchor method change even though the profiles stay the same. A court that will be covered later should be ordered with the roof base plates and the heavier corner posts from the start: retrofitting foundation and frame for a canopy after the court is playing is one of the most expensive retrofits in the sport, because it means interrupting play to work inside an operating court. See our court types comparison and the roof and canopy systems page for how that decision interacts with the cover you choose.
A bolted frame is only an advantage if the bundles arrive in the order they are needed and the holes line up on the first lift.
Steel profiles are bundled and strapped by assembly zone, with each bundle labelled to the shop drawing, and glass panels travel separately in wooden crates with foam separators because they are the part of the shipment that cannot be replaced locally. One complete court kit fits in a single 40 ft container; a double court takes two, and optional items such as lighting, doors, branding panels and spare parts share the same container space. We photograph the loading and send the container plan with the shipping documents, so the receiving site knows which bundle to open first.
On site, the assembly sequence is deliberately repetitive:
No field welding is required or wanted. A factory built the frame on jigs, drilled it against a template and galvanised it afterwards; welding on site destroys the coating at exactly the joint that carries the most load. If a hole does not line up, the answer is to find the packing error or call us, not to open it up with a torch. Full steps, torque guidance and the site checklist are in our installation and construction guide, and the quantities behind the packing list are in the bill of materials.
A steel frame is a document as much as it is a product: the paperwork is what your engineer, your customs broker and your insurer will ask for.
Every order ships with the drawing set and the material evidence for the actual production run, not for a sample:
The steel structure and load-bearing frame carry our 5-year structural warranty against manufacturing defects and corrosion; glass, mesh, turf, lighting and fittings carry their own component warranties, and the terms are issued in writing with the quotation rather than summarised at the end of a sales call. You can read the full terms on our warranty page, and the document set that accompanies a court order is described in the certification and compliance guide.
Steel is quoted from a specification, not a photograph. Seven points are enough for us to price a frame within 12 hours.
Orders are quoted per court and can be supplied as a complete court, as a structure-only frame for an existing glazing package, or as spare components for a facility already in operation. Minimum order is one court on standard models; production typically runs three to seven weeks depending on model and quantity, and the frame ships in the same container as the rest of the kit so the site receives one delivery, one packing list and one warranty. If you buy the structure on its own, tell us which glass thickness and panel sizes you are working with — the glazing profiles and hole patterns are matched at order stage rather than adapted on site.
Our frames are hot-dip galvanised first and then finished with two coats of polyester powder, for a total coating of 150–300 µm and a zinc layer of at least 70 µm. Paint-only frames are the cheapest option in a quotation and the most expensive in service: a 30–60 µm paint film typically flakes and shows rust within two to four years on an outdoor court, while hot-dip galvanising with a powder top coat is rated at 15–25 years and more in normal conditions. If a quotation says “anti-rust treatment” without naming hot-dip galvanising, ask for the zinc thickness figure before you compare prices.
A standard 20 × 10 m court takes roughly 3.5–4.5 tonnes of Q235B steel: four corner posts, intermediate posts on classic layouts, the upper ring and crossbeams, mesh frames, light-pole bases, base plates, gussets and the connecting hardware. That tonnage is the heaviest line in the kit and it is what your freight forwarder, crane and customs broker are actually handling. Adding glass (190–210 m²), turf, sand and mesh brings a complete court to around 13 tonnes delivered before foundation and lighting.
Yes. We quote structure-only orders for buyers who already have a glazing package, for installers replacing a damaged frame and for distributors holding stock. Two details make the difference between a frame that fits and one that does not: the glass thickness and panel sizes you are working with, and the fixing pattern your existing profiles use. Send both with the enquiry and the frame is drilled to match at the factory. Structure-only orders also ship more efficiently, because steel is dense and can be loaded without waiting for the glass crates.
Standard profiles are 100 × 100 × 3 mm square corner posts on our QF, PRO and WPT models, 80 × 80 × 3 mm on standard club models, 100 × 50 × 3 mm rectangular crossbeams and 50 × 30 × 2 mm mesh frames, with 3 mm as our minimum wall thickness on load-bearing posts and beams. An 80 × 80 × 2.5 mm profile is available as an entry-level grade for sheltered, recreational sites, and we will not supply 2 mm load-bearing posts. If your engineer specifies a particular section, send the drawing and we will quote to it.
Yes — every order includes a foundation drawing with the anchor-bolt coordinates, and a standard court uses roughly 16–20 embedded bolts around the perimeter. The bolts must be cast into the concrete while it is wet, held on a template, because they cannot be moved after curing. The concrete beneath the frame also has to meet the same tolerance as the court: a ring beam finished level to ±3 mm under a 3 m straight edge, with flatness across the court within ±3 mm (about 23.32 m on the diagonal). If you send your engineer's version of the drawing, we will check it against ours before the pour.
The steel structure and load-bearing frame carry a 5-year warranty against manufacturing defects and corrosion, with components such as glass, mesh, turf, lighting and fittings covered by their own warranties — all issued in writing with the quotation. Spare parts are quoted with the original order or supplied later against the court's serial documentation: bolts, washer sets, glass gaskets, hinges, door hardware, base plates and individual posts are all orderable. We recommend one spare glass panel per site as a minimum, because a damaged panel is the only component that cannot be sourced locally at short notice in most markets.
Posts, beams and base plates are the parts buyers stop looking at once the court is up, which is why the coating specification has to be fixed before production rather than after arrival. The plant that rolls, welds and galvanises these profiles is described on the China-based padel court manufacturer page.
Tell us the model, the court count, whether the site is indoor, outdoor or roofed, and your destination port — we will come back with the profile list, the coating specification, the drawings and a factory-direct price within 12 hours.