Key takeaway: Classic courts use a traditional post-and-panel frame — the most durable and affordable option for community clubs and budget-conscious projects. Panoramic courts eliminate intermediate posts for a seamless 240-degree glass wall, the tournament standard for broadcast events. Super panoramic courts further conceal corner posts using a unified frame system, offering maximum brand visibility for flagship facilities. Each type serves a different purpose — this guide helps you choose based on budget, target audience, and operating model.

The classic padel court is the original design built since the sport's inception. Steel posts are installed at regular intervals around the perimeter, and tempered glass panels sit between them. Each post carries its structural load independently — the glass bears no weight.
| Feature | Specification |
|---|---|
| Corner posts | 4 posts (100 x 100 x 3 mm galvanised steel) |
| Intermediate posts | 12 posts (100 x 50 x 3 mm) between glass panels |
| Glass panels | 18 panels, 12 mm tempered glass (2,995 x 1,995 mm each) |
| Mesh fencing | 46 panels (1 x 2 m, 50 x 50 mm grid) |
| Installation | 5-7 days, 3-person crew, bolt-assembly only |
Best for: Community clubs, schools, budget startups, and multi-court operators maximising court count.
Panoramic courts remove all 12 intermediate posts from the side and rear walls. Only four corner posts remain. Glass panels join edge-to-edge with stainless steel brackets, creating a seamless 240-degree glass surface. This is the standard for World Padel Tour and Premier Padel events.
| Feature | Specification |
|---|---|
| Corner posts | 4 posts (100 x 100 x 3 mm) — all load-bearing |
| Intermediate posts | None — glass joins directly |
| Glass panels | 22 panels, 12 mm tempered glass |
| Connectors | Stainless steel precision brackets |
| Installation | 6-8 days, 3-person crew |
Trade-off: Glass replacement takes 3-4 hours (vs 2h for classic) because adjacent panels must be handled. Budget for a more experienced maintenance team.
Best for: Tournament venues, premium clubs, media-focused facilities, clubs charging premium hourly rates.
Super panoramic — also called "full panoramic" — minimises or conceals rear corner posts through a unified top-and-bottom frame system. The court appears as a floating glass box with virtually no visible metal posts.
Trade-offs: 30-40% premium over classic; 7-10 day installation; requires experienced assembly crew. The ROI comes from premium pricing and sponsorship, not pure cost-per-court efficiency.
Best for: Luxury resorts, flagship city-centre clubs, high-sponsorship tournament venues.
| Feature | Classic | Panoramic | Super Panoramic |
|---|---|---|---|
| Intermediate posts | 12 visible | 0 (corners only) | 0 (concealed) |
| Glass panels | 18 | 22 | 22+ |
| Spectator view | Partially blocked | Clear 240° | Clear 360° |
| TV broadcast | No | Yes | Yes (optimal) |
| Relative cost | Baseline (100%) | +20-25% | +30-40% |
| Glass repair | ~2 hours | 3-4 hours | 3-4 hours |
| Install time | 5-7 days | 6-8 days | 7-10 days |
Classic: Distributed loading — 16 posts share wind and impact forces. Glass is non-structural. Fault-tolerant: a broken panel affects nothing else.
Panoramic: Coordinated frame — 4 corner posts + reinforced top/bottom beams form a unified structural cage. Glass contributes to overall rigidity. Tighter fabrication tolerances required.
Super Panoramic: Top frame carries most of the load through reinforced steel profiles. Heavier frame despite fewer posts. Engineering challenge: 20-year structural warranty with minimal visible supports.
| Cost Item | Classic | Panoramic | Super Panoramic |
|---|---|---|---|
| Court structure (FOB) | Contact for quote | Contact for quote | Contact for quote |
| Relative cost | Baseline | +20-25% | +30-40% |
| Premium per court | EUR 0 | ~EUR 3,000-5,000 | ~EUR 5,000-8,000 |
| Premium payback (at €30/hr, 50% util) | N/A | ~2-3 weeks of bookings | ~4-5 weeks of bookings |
The premium for panoramic or super panoramic is recovered within the first month of operation. After that, the higher hourly rates and increased player attraction generate a pure margin advantage for the remaining 11+ months of the year.
| Project Type | Recommended | Why |
|---|---|---|
| First-time club, tight budget | Classic | Lowest cost, fastest install, simplest maintenance |
| Multi-court operator | Classic (80%) + Panoramic (20%) | Volume economics; 1-2 show courts for premium bookings |
| Tournament venue | Panoramic | Required for broadcast; attracts competitive players |
| Luxury resort or premium club | Super Panoramic | Visual differentiation justifies premium pricing |
| Tennis court conversion | Classic or Panoramic | Check ceiling clearance; panoramic maximises visual appeal |
| Indoor facility, strong brand | Super Panoramic | Lighting highlights glass; sponsor logos highly visible |
The hybrid strategy: Many top clubs use 3 classic courts for daily volume and 1 panoramic court as the "show court" for events and premium bookings. This balances operating economics with brand positioning.
Tell us about your site, target market, and budget. We recommend the optimal configuration — including hybrid models. Detailed quotation within 12 hours.
Request Project Assessment →