Classic courts use a traditional post-and-panel frame — the most durable and affordable option for community clubs and budget-conscious projects. Panoramic courts eliminate intermediate posts for a seamless 240-degree glass wall, the tournament standard for broadcast events. Super panoramic courts further conceal corner posts using a unified frame system, offering maximum brand visibility for flagship facilities. Each type serves a different purpose — this guide helps you choose based on budget, target audience, and operating model.

The classic padel court is the original design built since the sport's inception. Steel posts are installed at regular intervals around the perimeter, and tempered glass panels sit between them. Each post carries its structural load independently — the glass bears no weight.
| Feature | Specification |
|---|---|
| Corner posts | 4 posts (100 x 100 x 3 mm galvanised steel) |
| Intermediate posts | 12 posts (100 x 50 x 3 mm) between glass panels |
| Glass panels | 18 panels, 12 mm tempered glass (2,995 x 1,995 mm each) |
| Mesh fencing | 46 panels (1 x 2 m, 50 x 50 mm grid) |
| Installation | 5-7 days, 3-person crew, bolt-assembly only |
Best for: Community clubs, schools, budget startups, and multi-court operators maximising court count.
Tell us your court count, country and timeline — we reply within 12 hours with factory-direct pricing, shipping and installation options. No obligation.
Prefer an instant answer? Ask the AI assistant at the bottom-right.
Panoramic courts remove all 12 intermediate posts from the side and rear walls. Only four corner posts remain. Glass panels join edge-to-edge with stainless steel brackets, creating a seamless 240-degree glass surface. This is the standard for World Padel Tour and Premier Padel events.
| Feature | Specification |
|---|---|
| Corner posts | 4 posts (100 x 100 x 3 mm) — all load-bearing |
| Intermediate posts | None — glass joins directly |
| Glass panels | 22 panels, 12 mm tempered glass |
| Connectors | Stainless steel precision brackets |
| Installation | 6-8 days, 3-person crew |
Trade-off: Glass replacement takes 3-4 hours (vs 2h for classic) because adjacent panels must be handled. Budget for a more experienced maintenance team.
Best for: Tournament venues, premium clubs, media-focused facilities, clubs charging premium hourly rates.
Super panoramic — also called "full panoramic" — minimises or conceals rear corner posts through a unified top-and-bottom frame system. The court appears as a floating glass box with virtually no visible metal posts.
Trade-offs: 30-40% premium over classic; 7-10 day installation; requires experienced assembly crew. The ROI comes from premium pricing and sponsorship, not pure cost-per-court efficiency.
Best for: Luxury resorts, flagship city-centre clubs, high-sponsorship tournament venues.
| Feature | Classic | Panoramic | Super Panoramic |
|---|---|---|---|
| Intermediate posts | 12 visible | 0 (corners only) | 0 (concealed) |
| Glass panels | 18 | 22 | 22+ |
| Spectator view | Partially blocked | Clear 240° | Clear 360° |
| TV broadcast | No | Yes | Yes (optimal) |
| Relative cost | Baseline (100%) | +20-25% | +30-40% |
| Glass repair | ~2 hours | 3-4 hours | 3-4 hours |
| Install time | 5-7 days | 6-8 days | 7-10 days |
Classic: Distributed loading — 16 posts share wind and impact forces. Glass is non-structural. Fault-tolerant: a broken panel affects nothing else.
Panoramic: Coordinated frame — 4 corner posts + reinforced top/bottom beams form a unified structural cage. Glass contributes to overall rigidity. Tighter fabrication tolerances required.
Super Panoramic: Top frame carries most of the load through reinforced steel profiles. Heavier frame despite fewer posts. Engineering challenge: 20-year structural warranty with minimal visible supports.
| Cost Item | Classic | Panoramic | Super Panoramic |
|---|---|---|---|
| Court structure (FOB) | Contact for quote | Contact for quote | Contact for quote |
| Relative cost | Baseline | +20-25% | +30-40% |
| Premium per court | EUR 0 | ~EUR 3,000-5,000 | ~EUR 5,000-8,000 |
| Premium payback (at €30/hr, 50% util) | N/A | ~2-3 weeks of bookings | ~4-5 weeks of bookings |
The premium for panoramic or super panoramic is recovered within the first month of operation. After that, the higher hourly rates and increased player attraction generate a pure margin advantage for the remaining 11+ months of the year.
Court type is only one line of the budget. The turf and the sand that fills it are quoted as separate items, and the pigmented product that Dutch-language buyers order as rode infill voor padel is priced in the sand infill guide — grain grade, kilos per court and the annual top-up routine. Add those lines before you compare court types on structure cost alone.
| Project Type | Recommended | Why |
|---|---|---|
| First-time club, tight budget | Classic | Lowest cost, fastest install, simplest maintenance |
| Multi-court operator | Classic (80%) + Panoramic (20%) | Volume economics; 1-2 show courts for premium bookings |
| Tournament venue | Panoramic | Required for broadcast; attracts competitive players |
| Luxury resort or premium club | Super Panoramic | Visual differentiation justifies premium pricing |
| Tennis court conversion | Classic or Panoramic | Check ceiling clearance; panoramic maximises visual appeal |
| Indoor facility, strong brand | Super Panoramic | Lighting highlights glass; sponsor logos highly visible |
The hybrid strategy: Many top clubs use 3 classic courts for daily volume and 1 panoramic court as the "show court" for events and premium bookings. This balances operating economics with brand positioning.
A classic court uses 16 posts - 4 corner posts of 100 x 100 x 3 mm plus 12 intermediate posts - to hold the glass and mesh panels. A panoramic court removes the 12 intermediate posts so 22 panels of 12 mm tempered glass join edge-to-edge into a seamless 240-degree wall. A super panoramic court goes further and conceals the corner posts with a unified frame.
Classic is the most durable and cost-effective choice for community clubs and budget-conscious projects. Panoramic is the tournament and broadcast standard, and lets clubs charge 15-25% more per hour. Super panoramic carries a 30-40% premium over classic and suits flagship venues that want maximum brand visibility.
Classic courts are normally installed in 5-7 days and panoramic courts in 6-8 days by a 3-person crew, while super panoramic takes 7-10 days and needs a more experienced assembly crew. All three share the same Q235B steel frame and 12 mm tempered glass base structure.
A classic court spreads wind and impact forces across 16 posts. A panoramic court uses 4 corner posts plus reinforced top and bottom beams as one unified structural cage, which is how it carries a 20-year structural warranty with minimal visible supports.
Yes. A local contractor replaces a single panel on a classic court in under 2 hours; on a panoramic court the same job takes 3-4 hours because the adjacent edge-to-edge panels have to be handled. Order 1-2 spare glass panels with the original shipment.
Tell us about your site, target market, and budget. We recommend the optimal configuration — including hybrid models. Detailed quotation within 12 hours.